Independent verification for performance-based water contracts. One protocol both sides sign, timestamped facts, and an attestation that triggers payment per cubic metre, in any country.

02In short

What a performance contract is.

A contract where the client pays per cubic metre actually delivered or saved. Veracity is the independent third party that verifies the volumes both sides are paid on.

  1. For watertech providers selling outcomes as a service.
  2. For utilities and industrials who pay for results.
  3. Veracity attests the facts; the contract sets the price.
Cross-section of a drinking water main with a leak
Schematic · illustrative, not a certified record

03The problem

Results delivered. Payment delayed.

  1. Every client counts the volumes differently.
  2. Payment waits on work the client controls, such as repairs.
  3. The data sits with the client.
Acoustic leak detection on a buried main
Schematic · illustrative, not a certified record

04One rulebook

Three things, agreed before work starts.

  1. 01The baseline Method, data and adjustments signed by both parties.
  2. 02The client's obligations Each one dated, with a written consequence if missed.
  3. 03The data Access to meters and work orders, written into the contract.
Key drivers and baseline data of a water network
Schematic · illustrative, not a certified record

05Who does what

We attest the facts. Your contract sets the price.

  1. 01ProviderDelivers and reports.
  2. 02ClientOperates, repairs, gives access.
  3. 03VeracityTimestamps and verifies the facts.
  4. 04ContractTurns verified volumes into payment.
Verified volume restored to the network
Schematic · illustrative, not a certified record

06Project types

Works wherever a cubic metre can be measured.

Verified volumes can later become certificates or attract corporate co-funding, claimed once.

  • Leak reduction
  • Industrial reuse
  • Rainwater
  • Aquifer recharge
  • Irrigation
  • Atmospheric water
  • Treatment-plant optimisation

07Get started

Turn CAPEX into OPEX without arguing over the numbers.

I am
Quoted on request

Not the right page?Certifying a project

+Questions

Does Veracity decide the payment?

No. Veracity attests the facts. The contract sets the price and the consequences.

What if the client delays a repair?

The contract sets a repair deadline per category. Veracity timestamps the notice, so the deadline is undisputed.

Which projects does it work for?

Any intervention where a cubic metre can be measured: leaks, industrial reuse, rainwater, recharge, irrigation, atmospheric water, treatment plants.

Can verified volumes become certificates?

Yes. The same volumes can later be certified or attract corporate co-funding, as long as each one is claimed once.

Who pays for verification?

A baseline set-up, then a flat fee per periodic attestation. The cost can be shared or built into the contract.